CPS: How to effectively implement intelligent power systems

A preview of CPS’ round table at the TowerXchange Meetup

Read this article to learn:

  • How to assure effective data capture for custom design, and how to scale the methodology across tower portfolios
  • How to prepare a site for the acceptance of intelligent power systems, ensuring installation can be completed in a single visit
  • How to assure competent teams are trained for implementation and maintenance of intelligent power systems
  • How to align the interests and process of tower operators, equipment providers, O&M & refueling contractors
  • How to measure and extend Mean Time To Failure (MTTF)

Clean Power Systems (CPS) has developed a unique process methodology for implementation, from initial custom design, through implementation of power solutions to meet the specific requirements of individual shared cell sites.  Utilizing the CPS methodology and related tools, CPS can effectively plan for scaled rollout or upgrade to hundreds or thousands of sites. If you…

This content is for Subscribers only

To read the full article either login below or follow the link to subscribe.

Log In Subscribe


Announcing an enhanced TowerXchange Journal – subscribe now!

Our new improved offering will allow you to access the insight and analysis you have come to rely on from TowerXchange – but in a format that suits you.

We would love you to continue to receive the TowerXchange Journal by subscribing, and to contribute to the knowledge sharing and information resource we have built up in the form of over 2.5mn words of research and almost 1,000 CXO interviews. An individual subscription costs GBP£2,500 per year, with corporate subscriptions priced according to scale.

Subscribe now